DL/T5418-2009火电厂烟气脱硫吸收塔施工及验收规程(英文版)
上QQ阅读APP看本书,新人免费读10天
设备和账号都新为新人

4 General

4.0.1 The absorber shall be constructed in strict accordance with the design documents.Any revisions to the design documents,where necessary,must be under written permission from design institute.

4.0.2 The construction shall comply with the requirements of DL 5009.1.